Project : Hong Kong Gold Coast Hotel ( Dec., 2008. )
Phase 2 Site A, T.M.T.L.238 So Kwun Way Area 57, Tuen Mun, N.T.

| Completion Date : |
Dec., 2008. |
| Specification : |
60 minutes Integrity & Insulation F.R.P. Window
(Use 30mm thk. “Longdian” 60min. Integrity &
Insulation Tempered Glass with 6mm thk. Cavity
& 6mm thk. Tempered Clear Glass Total 42mm thk.) |
| Size : |
800mm (W) x 2500mm (H) x 3 Sets
1400mm (W) x 2500mm (H) x 4 Sets |
| | |
|